workflow

SOC 2 Type II Interim Testing

Interim fieldwork for the Type II examination: cycle walkthroughs, design assessment against the Trust Services Criteria, the first operating-effectiveness testing wave over the agreed interim evidence window, and exception triage feeding remediation and retest planning before the period closes. Interim SOC 2 Type II fieldwork for the listed control selections and agreed interim window. Later-period testing and the service auditor's independent opinion remain outside this module. Attach this workflow to the existing audit engagement item; retain evidence and conclusions on its workflow steps.

Record JSON · Open in map · Data retrieval guide

Catalog revision: f368a6cce277037e4b1e1ff46004e3acd295f96c9ac63a411a0e45775a7f468e. A connection does not establish full coverage.

Attributes

domain
audit
department
internal-audit
lineOfDefense
assure

Details

teams
  • internal-audit
domains
  • audit
standards
  • soc2
sourceTemplateId
workflow-library:audit-soc2-type2-interim-testing
releaseId
sha256:e9403dda67cabe5a114e5eb46995efc3ed5ece1970059463cdc7696ac0bbca24
canonicalUrl
https://assureswarm.com/workflows/all/?w=audit-soc2-type2-interim-testing
capabilities
    mappingStatus
    mapped
    lineOfDefense
    assure
    controls
    • UC-ACCESS-01
    • UC-ACCESS-02
    • UC-ACCESS-03
    • UC-ACCESS-09
    • UC-BCDR-03
    • UC-BCDR-10
    • UC-CONFIG-01
    • UC-CONFIG-02
    • UC-CRYPTO-01
    • UC-GOV-16
    • UC-GOV-21
    • UC-HR-01
    • UC-IR-06
    • UC-IR-10
    • UC-LOG-01
    • UC-RISK-14
    • UC-TRAIN-01
    • UC-VULN-03
    roleIntegrity
    activityCount
    0
    ermPhases
      lineRoles
        serviceModes
          warnings

            Source

            No record-specific source URL is provided.

            Download workflow template · Release: sha256:e9403dda67cabe5a114e5eb46995efc3ed5ece1970059463cdc7696ac0bbca24

            Connections